Supply and installation of the following works (8,300,000.00 QAR):
Construction and MEP works in collaboration with CGC/ BIS
- Construction & Finishing
- Ventilation & Air conditioning
- Electrical (Lighting & small power)
- Earthing system
- Transformer and LV Panel
- Drainage & Water supply