Supply and installation of the following works (8,300,000.00 QAR):

Construction and MEP works in collaboration with CGC/ BIS

  • Construction & Finishing
  • Ventilation & Air conditioning
  • Electrical (Lighting & small power)
  • Earthing system
  • Transformer and LV Panel
  • Drainage & Water supply